第1页:Unit Three 词汇与短语

Vocabulary, Phrases and Expressions(词汇与短语)

本页为 Unit Three Cost Estimation(成本估算)单元的词汇部分标题页,其后各页按词条列出本单元核心术语的英文表达与中文释义。

第2页:资本成本构成词汇

资本成本构成词汇:Unit Three Cost Estimation(成本估算)单元词汇与短语,下列词条给出英文术语与中文释义。

cost estimation
成本估算
initial capital
创办成本;初始投资
operation and maintenance costs
运行与养护费用
Land acquisition
土地获得
Field supervision of construction
现场施工监督
overhead
企业一般管理费用
project lifecycle
项目生命周期
land rent
土地租金

第3页:成本构成与造价工程词汇

成本构成与造价工程词汇:Unit Three Cost Estimation(成本估算)单元词汇与短语,下列词条给出英文术语与中文释义。

periodic renovations
周期性更新
financial costs
财务成本
construction cost
施工建设费
unexpected costs
不可预见费用
cost engineers
造价工程师
cost engineering
工程估价
cost control
成本控制
production function
产出函数

第4页:生产成本与估价类型词汇

生产成本与估价类型词汇:Unit Three Cost Estimation(成本估算)单元词汇与短语,下列词条给出英文术语与中文释义。

the amount or volume of output
产出总量
production cost
生产成本
empirical cost inference
经验成本推论
bill of quantities
工程量清单
unit cost
单位成本
joint costs
联合成本
accuracy of cost estimates
估价精度
design estimate
设计估价

第5页:筛选、初步与详细估算

筛选、初步与详细估算:Unit Three Cost Estimation(成本估算)单元词汇与短语,下列词条给出英文术语与中文释义。

bid estimate
投标估价
screening estimates (or order of magnitude estimates)
筛选估计;匡算(或数量级估计)
preliminary estimates (or conceptual estimates)
初步估算(或概念性估算)
detailed estimates (or definitive estimates)
详细估计(或确定估计)

第6页:直接成本与预算估价词汇

直接成本与预算估价词汇:Unit Three Cost Estimation(成本估算)单元词汇与短语,下列词条给出英文术语与中文释义。

direct construction cost
直接施工成本
profits
利润
control estimate
控制估价
budget estimate
财务预算

第7页:Unit Three 问题与解答

Questions and Answers(问题与解答)

本页为 Unit Three Cost Estimation(成本估算)单元的问答部分标题页,其后各页以英文问答形式复述本单元要点。

第8页:资本成本包含的费用

1. Which expenses are included in the capital cost for a construction project?

The capital cost for a construction project includes the expenses related to the initial establishment of the facility.

第9页:运营与养护费用的构成

2. Which expenses are included in the operation and maintenance cost in subsequent years over the project lifecycle?

Land rent, if applicable

  1. Operating staff
  2. Labor and material for maintenance and repairs
  3. Periodic renovations
  4. Insurance and taxes
  5. Financing costs
  6. Utilities
  7. Owner's other expenses.

第10页:施工成本是否为最大单项

3. Which cost maybe the single largest component of the capital cost?

Are the other cost components insignificant? While the construction cost may be the single largest component of the capital cost, other cost components are not insignificant.

第11页:不可预见费的估算依据

4. How does the construction firm estimate the amount of contingency?

The amount of contingency is based on historical experience and the expected difficulty of a particular construction project.

第12页:成本估算的基线作用

5. Why is a cost estimate important at different stages of development of the project?

A cost estimate establishes the base line of the project cost at different stages of development of the project.

第13页:各阶段估算的精度要求

6.

Say about the required levels of accuracy of construction cost estimates vary at different stages of project development. The required levels of accuracy of construction cost estimates vary at different stages of project development, ranging from ball park figures in the early stage to fairly reliable figures for budget control prior to construction. Since design decisions made at the beginning stage of a project life cycle are more tentative than those made at a later stage, the cost estimates made at the earlier stage are expected to be less accurate.

第14页:按功能划分的估价类型

7. How to classify cost estimates according to their functions?

Cost estimates can best be classified into three major categories according to their functions. A construction cost estimate serves one of the three basic functions: design, bid and control.

第15页:规划设计阶段的估价类型

8. For the owner or its designated design professionals, what types of cost estimates encountered run parallel with the planning and design?

(1) Screening estimates (or order of magnitude estimates).(2) Preliminary estimates (or conceptual estimates).(3) Detailed estimates (or definitive estimates).(4) Engineer's estimates based on plans and specifications.

第16页:总承包商的投标估价

9. How a general contractor prepare a bid estimate?

If a general contractor intends to use subcontractors in the construction of a facility, it may solicit price quotations for various tasks to be subcontracted to specialty subcontractors. Thus, the general subcontractor will shift the burden of cost estimating to subcontractors. If all or part of the construction is to be undertaken by the general contractor, abid estimate may be prepared on the basis of the quantity takeoffs from the plans provided by the owner or on the basis of the construction procedures devised by the contractor for implementing the project.

第17页:业主与承包商的控制估价

10. How the owner and the contractor control estimate?

For the owner, a budget estimate must be adopted early enough for planning long term financing of the facility. For the contractor, the bid estimate is usually regarded as the budget estimate, which will be used for control purposes as well as for planning construction financing.

第18页:Unit Three 单元结束页

End of This Unit(本单元结束)

本页为 Unit Three Cost Estimation(成本估算)单元的结束页,标示本单元的词汇与问答内容到此结束。